Digital Wireline Logs for SE Gobe 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for SE Gobe 3 in the Papuan, Papua New Guinea, operated by MIM, drilled to a total depth of 2,312 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,312 m
- Datum Elevation
- 951.7 m
- Spud Date
- 07/03/1992
- Completion Date
- 14/04/1992
- Permit
- -
- Rig
- Rig 125
Location
- Latitude
- -6.8365
- Longitude
- 143.8110