Digital Wireline Logs for Tumuli 1 ST1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tumuli 1 ST1 in the Papuan, Papua New Guinea, operated by Santos, drilled to a total depth of 2,024 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,024 m
- Datum Elevation
- -
- Spud Date
- 21/03/1999
- Completion Date
- 28/04/1999
- Permit
- -
- Rig
- Rig 160
Location
- Latitude
- -5.3147
- Longitude
- 142.2330