Digital Wireline Logs for CH4 Peak Downs 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Peak Downs 7 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 438 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 438 m
- Datum Elevation
- 213.8 m
- Spud Date
- 24/11/2003
- Completion Date
- 05/12/2003
- Permit
- ATP 364 P
- Rig
- UDR 650
Location
- Latitude
- -22.1511
- Longitude
- 148.1700