Digital Wireline Logs for Cockatoo Creek 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Cockatoo Creek 2 in the Bowen, Queensland, operated by Conoco, drilled to a total depth of 1,590 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,590 m
- Datum Elevation
- 205.5 m
- Spud Date
- 08/07/1995
- Completion Date
- 22/07/1995
- Permit
- -
- Rig
- -
Location
- Latitude
- -25.5631
- Longitude
- 150.1110