Digital Wireline Logs for Champagne Creek 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Champagne Creek 3 in the Bowen, Queensland, operated by Sunshine, drilled to a total depth of 1,857 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,857 m
- Datum Elevation
- 264.1 m
- Spud Date
- 22/11/2004
- Completion Date
- 25/12/2004
- Permit
- ATP 768 P
- Rig
- Rig 151
Location
- Latitude
- -25.3533
- Longitude
- 149.8310