Digital Wireline Logs for Cullin 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Cullin 1 in the Bowen, Queensland, operated by BNG Ops, drilled to a total depth of 582 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 582 m
- Datum Elevation
- -
- Spud Date
- 19/07/2003
- Completion Date
- 01/10/2003
- Permit
- EPP 693
- Rig
- -
Location
- Latitude
- -23.7558
- Longitude
- 148.0720