Skip to content

Digital Wireline Logs for Dawson River 19

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Bowen, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for Dawson River 19 in the Bowen, Queensland, operated by Conoco, drilled to a total depth of 809 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Dawson River 19
Basin
Bowen
State
Queensland
Classification
CBM
Operator
Conoco
Driller
-

Drilling Data

Total Depth
809 m
Datum Elevation
-
Spud Date
01/05/1996
Completion Date
05/05/1996
Permit
PL 94
Rig
-

Location

Latitude
-24.7950
Longitude
150.0110