Digital Wireline Logs for Dawson River 20
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dawson River 20 in the Bowen, Queensland, operated by Conoco, drilled to a total depth of 940 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 940 m
- Datum Elevation
- -
- Spud Date
- 06/05/1996
- Completion Date
- 11/05/1996
- Permit
- PL 94
- Rig
- -
Location
- Latitude
- -24.7944
- Longitude
- 150.0030