Digital Wireline Logs for Harcourt 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Harcourt 3 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 1,314 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,314 m
- Datum Elevation
- -
- Spud Date
- 13/06/2002
- Completion Date
- 10/07/2002
- Permit
- EPP 564
- Rig
- -
Location
- Latitude
- -24.4406
- Longitude
- 150.0210