Digital Wireline Logs for Lilyvale 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Lilyvale 1 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 407 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 407 m
- Datum Elevation
- -
- Spud Date
- 02/12/2000
- Completion Date
- 26/12/2000
- Permit
- EPP 564
- Rig
- -
Location
- Latitude
- -23.2331
- Longitude
- 148.4440