Digital Wireline Logs for Gemini 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Gemini 1 in the Bowen, Queensland, operated by Hematite, drilled to a total depth of 610 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 610 m
- Datum Elevation
- 224.6 m
- Spud Date
- 19/05/1980
- Completion Date
- 29/05/1980
- Permit
- -
- Rig
- Ideco H35
Location
- Latitude
- -23.7230
- Longitude
- 148.9000