Digital Wireline Logs for Blackdown 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Blackdown 2 in the Bowen, Queensland, operated by MIM, drilled to a total depth of 927 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 927 M
- Datum Elevation
- -
- Spud Date
- 07/08/1992
- Completion Date
- 22/08/1992
- Permit
- EPP 447
- Rig
- -999.25
Location
- Latitude
- -23.8761
- Longitude
- 148.9290