Digital Wireline Logs for Blackdown 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Blackdown 3 in the Bowen, Queensland, operated by MIM, drilled to a total depth of 768 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 768 M
- Datum Elevation
- -
- Spud Date
- 30/05/1992
- Completion Date
- 21/06/1992
- Permit
- EPP 447
- Rig
- -999.25
Location
- Latitude
- -23.7886
- Longitude
- 148.9600