Digital Wireline Logs for Lilyvale 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Lilyvale 3 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 441 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 441 m
- Datum Elevation
- -
- Spud Date
- 28/12/2000
- Completion Date
- 23/02/2001
- Permit
- EPP 564
- Rig
- -
Location
- Latitude
- -23.3453
- Longitude
- 148.3010