Digital Wireline Logs for Mackenzie Scout 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mackenzie Scout 2 in the Bowen, Queensland, operated by AFOF, drilled to a total depth of 183 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 183 m
- Datum Elevation
- -
- Spud Date
- 20/08/1964
- Completion Date
- 21/08/1964
- Permit
- EPP 56
- Rig
- -
Location
- Latitude
- -23.0417
- Longitude
- 149.4080