Digital Wireline Logs for Duckworth 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Duckworth 1 in the Bowen, Queensland, operated by Focal, drilled to a total depth of 895 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 895 m
- Datum Elevation
- 160.0 m
- Spud Date
- 23/09/2007
- Completion Date
- 02/10/2007
- Permit
- ATP 806 P
- Rig
- Rig 182, 123
Location
- Latitude
- -23.5242
- Longitude
- 149.0840