Digital Wireline Logs for Midnight Creek 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Midnight Creek 1 in the Bowen, Queensland, operated by Tipperary, drilled to a total depth of 1,250 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,250 m
- Datum Elevation
- -
- Spud Date
- 01/06/2002
- Completion Date
- 15/06/2002
- Permit
- EPP 526
- Rig
- -
Location
- Latitude
- -25.5731
- Longitude
- 149.0800