Digital Wireline Logs for Moura 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moura 11 in the Bowen, Queensland, operated by MIM, drilled to a total depth of 613 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 613 m
- Datum Elevation
- -
- Spud Date
- 30/05/1995
- Completion Date
- 07/06/1995
- Permit
- EPP564
- Rig
- -
Location
- Latitude
- -24.6489
- Longitude
- 150.0060