Digital Wireline Logs for Nipan 18
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Nipan 18 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 695 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 695 m
- Datum Elevation
- -
- Spud Date
- 04/07/2000
- Completion Date
- 10/07/2000
- Permit
- PL 94
- Rig
- -
Location
- Latitude
- -24.7244
- Longitude
- 150.0110