Digital Wireline Logs for Yellowbank 6
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Yellowbank 6 in the Bowen, Queensland, operated by CQNG, drilled to a total depth of 1,789 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,789 M
- Datum Elevation
- -
- Spud Date
- 05/09/1990
- Completion Date
- 04/10/1990
- Permit
- -
- Rig
- Rig 19
Location
- Latitude
- -25.4431
- Longitude
- 148.3890