Digital Wireline Logs for Brumby 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Brumby 11 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,316 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,316 m
- Datum Elevation
- 83.2 m
- Spud Date
- 11/12/1996
- Completion Date
- 25/12/1996
- Permit
- -
- Rig
- Rig 2
Location
- Latitude
- -28.3924
- Longitude
- 141.0010