Digital Wireline Logs for Challum 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 11 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,650 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,650 m
- Datum Elevation
- 92.0 m
- Spud Date
- 07/10/1998
- Completion Date
- 27/10/1998
- Permit
- PL 59
Location
- Latitude
- -27.3990
- Longitude
- 141.5350