Digital Wireline Logs for Challum 12
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 12 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,670 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,670 m
- Datum Elevation
- 82.0 m
- Spud Date
- 02/11/1998
- Completion Date
- 19/11/1998
- Permit
- PL 59
Location
- Latitude
- -27.4285
- Longitude
- 141.6480