Digital Wireline Logs for Challum 17 DW 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 17 DW 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 3,017 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,017 m
- Datum Elevation
- 84.0 m
- Spud Date
- 18/06/2000
- Completion Date
- 25/07/2000
- Permit
- PL 59
- Rig
- Rig 26
Location
- Latitude
- -27.4080
- Longitude
- 141.6300