Digital Wireline Logs for Challum 21 DW2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 21 DW2 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,345 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,345 m
- Datum Elevation
- 81.9 m
- Spud Date
- 18/01/2001
- Completion Date
- 12/02/2001
- Permit
- PL 58
- Rig
- Rig 26
Location
- Latitude
- -27.3882
- Longitude
- 141.5520