Digital Wireline Logs for Challum 24
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 24 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,492 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,492 m
- Datum Elevation
- 78.0 m
- Spud Date
- 10/01/2001
- Completion Date
- 29/01/2001
- Permit
- PL 59
- Rig
- Rig 18
Location
- Latitude
- -27.3829
- Longitude
- 141.5960