Digital Wireline Logs for Challum 25
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum 25 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,526 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,526 m
- Datum Elevation
- 79.0 m
- Spud Date
- 21/02/2001
- Completion Date
- 09/03/2001
- Permit
- PL 59
- Rig
- Rig 18
Location
- Latitude
- -27.3891
- Longitude
- 141.6190