Skip to content

Digital Wireline Logs for Challum 25

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Cooper, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for Challum 25 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,526 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Challum 25
Basin
Cooper
State
Queensland
Classification
NDOD
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
2,526 m
Datum Elevation
79.0 m
Spud Date
21/02/2001
Completion Date
09/03/2001
Permit
PL 59
Rig
Rig 18

Location

Latitude
-27.3891
Longitude
141.6190