Skip to content

Digital Wireline Logs for Challum 27

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Cooper, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for Challum 27 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,411 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Challum 27
Basin
Cooper
State
Queensland
Classification
NDOD
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
2,411 m
Datum Elevation
91.6 m
Spud Date
19/01/2004
Completion Date
06/02/2004
Permit
PL 58
Rig
Rig 18

Location

Latitude
-27.3935
Longitude
141.5440