Digital Wireline Logs for Challum West 1
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Challum West 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 3,029 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,029 m
- Datum Elevation
- 102.0 m
- Spud Date
- 07/02/1998
- Completion Date
- 02/03/1998
- Permit
- PL 58
Location
- Latitude
- -27.3590
- Longitude
- 141.5020