Digital Wireline Logs for Chiron 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Chiron 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,868 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,868 m
- Datum Elevation
- 104.0 m
- Spud Date
- 12/08/1996
- Completion Date
- 26/08/1996
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -28.4793
- Longitude
- 141.0830