Digital Wireline Logs for Endeavour 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Endeavour 11 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,433 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,433 m
- Datum Elevation
- 190.5 m
- Spud Date
- 21/04/2006
- Completion Date
- 28/04/2006
- Permit
- -
- Rig
- Rig 24
Location
- Latitude
- -26.7910
- Longitude
- 143.3850