Digital Wireline Logs for Endeavour 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Endeavour 5 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,438 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,438 m
- Datum Elevation
- 188.1 m
- Spud Date
- 06/04/2005
- Completion Date
- 15/04/2006
- Permit
- -
- Rig
- Rig 24
Location
- Latitude
- -26.7895
- Longitude
- 143.3770