Digital Wireline Logs for Hera 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hera 2 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,914 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,914 m
- Datum Elevation
- 76.8 m
- Spud Date
- 27/07/2001
- Completion Date
- 21/08/2001
- Permit
- PL 131
- Rig
- Rig 18
Location
- Latitude
- -27.6842
- Longitude
- 141.8570