Digital Wireline Logs for Ipundu North 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Ipundu North 4 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 911 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 911 m
- Datum Elevation
- 180.0 m
- Spud Date
- 22/09/1996
- Completion Date
- 26/09/1996
- Permit
- -
- Rig
- Rig 11
Location
- Latitude
- -26.9155
- Longitude
- 143.3050