Digital Wireline Logs for Irtalie East 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Irtalie East 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,885 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,885 M
- Datum Elevation
- -
- Spud Date
- 08/10/2010
- Completion Date
- 21/10/2010
- Permit
- PL 36
- Rig
- Ensign
Location
- Latitude
- -27.7288
- Longitude
- 142.2650