Digital Wireline Logs for Irtalie East 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Irtalie East 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,880 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,880 m
- Datum Elevation
- 262.9 m
- Spud Date
- 05/10/2012
- Completion Date
- 17/10/2012
- Permit
- PL 35
- Rig
- Rig 184
Location
- Latitude
- -27.7238
- Longitude
- 142.2540