Digital Wireline Logs for Juno 1 - CE
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Juno 1 - CE in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,784 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,784 m
- Datum Elevation
- 72.8 m
- Spud Date
- 23/10/1996
- Completion Date
- 09/01/1997
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -27.6969
- Longitude
- 141.8280