Digital Wireline Logs for Juno 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Juno 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,928 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,928 m
- Datum Elevation
- 73.6 m
- Spud Date
- 24/07/2001
- Completion Date
- 20/09/2001
- Permit
- PL 131
- Rig
- Rig 18
Location
- Latitude
- -27.6961
- Longitude
- 141.8350