Digital Wireline Logs for Munro 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Munro 7 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,503 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,503 m
- Datum Elevation
- 124.4 m
- Spud Date
- 04/10/2011
- Completion Date
- 14/10/2011
- Permit
- PL 55
- Rig
- Rig 184
Location
- Latitude
- -28.5308
- Longitude
- 141.1930