Digital Wireline Logs for Roti 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Roti 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,426 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,426 m
- Datum Elevation
- 101.0 m
- Spud Date
- 31/03/2001
- Completion Date
- 17/04/2001
- Permit
- PL 195
- Rig
- Rig 18
Location
- Latitude
- -27.3905
- Longitude
- 142.1790