Digital Wireline Logs for Sigma 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Sigma 2 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,710 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,710 m
- Datum Elevation
- 127.1 m
- Spud Date
- 15/11/1987
- Completion Date
- 23/11/1987
- Permit
- ATP 259 P
- Rig
- Rig 30
Location
- Latitude
- -28.3419
- Longitude
- 141.3420