Digital Wireline Logs for Surlow 1
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Surlow 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,424 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,424 m
- Datum Elevation
- 79.0 m
- Spud Date
- 16/10/2003
- Completion Date
- 01/11/2003
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -27.3373
- Longitude
- 141.9640