Digital Wireline Logs for Vega North 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Vega North 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,794 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,794 m
- Datum Elevation
- 73.6 m
- Spud Date
- 23/09/2001
- Completion Date
- 18/10/2001
- Permit
- ATP 259 P
- Rig
- Rig 18
Location
- Latitude
- -27.7015
- Longitude
- 141.8830