Digital Wireline Logs for Wackett 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wackett 11 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,965 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,965 m
- Datum Elevation
- 71.9 m
- Spud Date
- 23/08/2000
- Completion Date
- 05/09/2000
- Permit
- PL 85
- Rig
- Rig 18
Location
- Latitude
- -27.4898
- Longitude
- 141.9680