Digital Wireline Logs for Wackett 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wackett 9 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,014 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,014 m
- Datum Elevation
- 80.0 m
- Spud Date
- 28/04/1999
- Completion Date
- 11/05/1999
- Permit
- PL 25
- Rig
- Rig 26
Location
- Latitude
- -27.5070
- Longitude
- 142.0020