Digital Wireline Logs for Wackett SE 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wackett SE 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,590 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,590 m
- Datum Elevation
- 70.1 m
- Spud Date
- 09/09/2000
- Completion Date
- 28/09/2000
- Permit
- PL 25
- Rig
- Rig 18
Location
- Latitude
- -27.5964
- Longitude
- 142.0060