Digital Wireline Logs for Wippo East 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wippo East 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,602 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,602 m
- Datum Elevation
- 85.0 m
- Spud Date
- 12/06/2000
- Completion Date
- 06/07/2000
- Permit
- ATP 259 P
- Rig
- Rig 18
Location
- Latitude
- -27.2951
- Longitude
- 142.1200