Digital Wireline Logs for Wippo East 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wippo East 2 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,551 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,551 m
- Datum Elevation
- 79.0 m
- Spud Date
- 19/11/2000
- Completion Date
- 12/12/2000
- Permit
- ATP 259 P
- Rig
- Rig 1
Location
- Latitude
- -27.2707
- Longitude
- 142.1300