Digital Wireline Logs for Yanda 13
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Yanda 13 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,552 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,552 m
- Datum Elevation
- 133.0 m
- Spud Date
- 18/05/1999
- Completion Date
- 01/06/1999
- Permit
- PL 61
- Rig
- Rig 26
Location
- Latitude
- -27.4427
- Longitude
- 141.8170