Digital Wireline Logs for Barrolka East 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Barrolka East 2 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 2,715 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,715 m
- Datum Elevation
- -
- Spud Date
- 31/10/1997
- Completion Date
- 17/12/1997
- Permit
- EPP259
- Rig
- -
Location
- Latitude
- -26.8572
- Longitude
- 141.7950